Commissioning

Remote Solar Commissioning
Support for Contractors & EPCs

Commissioning problems are expensive — they delay interconnection, hold up final payments, and create service calls right after handoff. Our specialists join your commissioning team remotely to work through inverter startup, parameter verification, grid compliance settings, and monitoring platform setup.

What We Cover

Commissioning Support Services

Inverter Pre-Commissioning Review

Before energization, we review your system design, wiring drawings, and parameter settings to identify potential issues — so you find them before the utility inspector does.

Startup Sequence Guidance

Step-by-step remote walk-through of the inverter startup sequence — DC breaker energization, grid synchronization, initial output verification, and fault-free operation confirmation.

Grid Interconnection Settings

Verification that voltage, frequency, anti-islanding, ramp rate, and reactive power settings match the utility interconnection agreement — critical for avoiding interconnection delays.

Optimizer & Microinverter Pairing

Remote support for SolarEdge optimizer pairing via SetApp and Enphase microinverter commissioning via the Enlighten platform or Installer Toolkit.

Battery Storage Commissioning

BESS startup guidance — initial charge procedures, BMS parameter review, AC/DC coupling verification, backup and export mode setup, and safety interlock confirmation.

Monitoring Platform Setup

Configuration and verification of inverter monitoring connectivity — Modbus, RS485, Ethernet, and cloud platform setup for SolarEdge, SMA, Enphase, FusionSolar, iSolarCloud, and others.

Common Commissioning Issues We Help Resolve

Inverter failing to synchronize with the grid at startup
Grid compliance settings that don't match the interconnection agreement
Optimizer pairing failures or uncommunicating units
Battery not entering charge mode after initial startup
Monitoring platform not receiving inverter data
Isolation fault appearing during initial energization
Incorrect string configuration detected at startup
Commissioning documentation gaps that delay utility approval
Scope & Limitations

What This Service Includes — and What It Doesn't

We want you to know exactly what to expect before you engage our support.

What We Provide

  • Remote guidance during inverter startup and configuration
  • Pre-commissioning review of settings, wiring, and documentation
  • Grid compliance verification against utility interconnection requirements
  • Real-time fault diagnosis during first energization
  • Commissioning documentation and test result summaries
  • Optimizer pairing and monitoring platform setup guidance

What We Don't Provide

  • Physical commissioning work or on-site presence
  • AHJ or utility inspection representation
  • Guaranteed first-pass inspection approval
  • Equipment sales, parts ordering, or product supply
  • Manufacturer-authorized commissioning certification
  • BESS commissioning — currently under review, contact us to discuss
Before You Call

What to Prepare Before Your Session

Having this information ready helps us assess your issue efficiently and make the most of the support session.

Inverter Make & Model

Manufacturer, model number, and firmware version if available.

Utility Interconnection Agreement

The approved inverter settings profile or utility requirements document.

System Design Documents

Single-line diagram, string layout, and wiring drawings for review.

Commissioning Checklist

If your company or the AHJ requires a specific checklist, have it ready.

Target Energization Date

When you plan to commission, so we can schedule support to align with your timeline.

On-Site Contact

Who will be on site performing the work and their phone number for the session.

FAQ

Frequently Asked Questions

Manufacturers We Support

Independent remote support for all major solar inverter and equipment manufacturers. Select a manufacturer for supported models, monitoring platforms, and common issues.

Schedule

Request Commissioning Support

Tell us the system type, inverter brand, system size, and your target commissioning date.

Contact Information

About You & Your System

Equipment Details

For urgent issues, submit your request and we'll confirm availability as quickly as possible. Visit our priority support page for time-sensitive situations.